Friday 23 September 2011

It Takes A Village!

The library has been moving back to our "old" location in the 1898 City Hall building. The renos included the installation of a sprinkler system (won't that be good for a library if it goes off unnecessarily?), a geothermal heating system, new wiring, and a somewhat raised ceiling. We started the work last Friday by having a cleaning crew come in to wash all the shelving, clean the bathroom (a new one), and to start putting things away. Last weekend, volunteer crews came in to pack books at the temporary location. That went so well that Monday we were able to cancel the work party. Tuesday, the grade 7 class helped us move our things from their storage location (this was half of our collection, packed into boxes since January) and they did a superb job. Everything was placed into our permanent location and it was colour-coded for location. Wednesday and Thursday, we had volunteers shelving materials from all the boxes. We all worked like stink. It got done. Saturday we plan to be open! Let's hope that the internet gods and goddesses continue to bless us. Our librarian, Eva, is a master of moves!

No comments: